LAB / 037
MuJoCo obstacle clearance: a point path is not a body path
Six contact trajectories compare direct, edge and clearance paths while separating geometry from controller tracking.
EXPERIMENT RESULT
01 / QUESTION
Six contact trajectories compare direct, edge and clearance paths while separating geometry from controller tracking.
METHOD
Freeze protocol and source before execution, save raw records, then independently recompute metrics and verify hashes.
RESULT
Two clearance routes pass without contact; four direct/edge routes contact the obstacle and fail.
OBSERVATIONS
Two clearance routes pass without contact; four direct/edge routes contact the obstacle and fail.
CONCLUSION
Conclusions are limited to the stated variables and acceptance criteria, retaining failures and unverified scope.
LIMITATIONS
Teaching-scale fixed conditions, not online model quality, production throughput or hardware safety. The complete assistant and VL01 remain unfinished.
REPRODUCE
The article provides a pinned revision, environment, runner and independent audit commands.
KEEP EXPLORING
Related content
- Engineering cases
MuJoCo obstacle clearance: a point path is not a body path
Six contact trajectories compare direct, edge and clearance paths while separating geometry from controller tracking.
- PROJECT / 003
Hohoo Embodied Experiments
Two MuJoCo teaching scenes—pick-and-place and planar force control—record contracts, tuning, clearance and delayed-feedback outcomes, including failures.
- Engineering cases
A second MuJoCo scene: why does the actuator overshoot?
Compare mass and PD damping in a planar force-controlled actuator, separating target crossing from stable completion.