E3 / Contact monitoring during transfer
Separate missed loss, false cancellation and confirmation delay using forced opening and one empty contact report.
EXPERIMENT RESULT
01 / QUESTION
Separate missed loss, false cancellation and confirmation delay using forced opening and one empty contact report.
METHOD
Fixed zero-offset scene; three conditions × three policies × three deterministic repeats = 27 rollouts. Observe at 50 Hz and hold the target for 0.6 s after an alarm.
RESULT
Immediate cancellation falsely interrupts one empty report; three-sample confirmation tolerates it. Both monitors cancel transfer after forced opening without recovering placement.
OBSERVATIONS
First bad sample: 4.802 s; three-sample alarm: 4.842 s. Confirmation adds 40 ms relative to immediate cancellation; subsequent measured XY paths are 11.902 and 22.534 mm respectively.
CONCLUSION
Monitoring changes actions after failure but does not recover the fallen cube; the threshold trades false cancellations against waiting.
LIMITATIONS
Privileged state, fixed conditions, transfer only. Forced opening is not natural slip. Path horizons differ; no vision, stale-packet timeout, recovery or hardware emergency stop.
REPRODUCE
11 boundary tests and 27 independent rollout audits passed; 18 matching state prefixes. Pinned CSV, full states, plots and two CPU coordinate replays. OpenGL scene rendering was unavailable.
KEEP EXPLORING
Related content
- Engineering cases
Embodied practice III: a confirmed grasp still needs monitoring
A 27-rollout MuJoCo comparison of transient observation loss and forced opening, with false cancellations, a 40 ms confirmation delay, code and recorded trajectories.
- Engineering cases
Embodied practice II: if the grasp failed, skip the transfer
An 18-rollout MuJoCo comparison of a lift/contact gate, with recorded trajectories, videos, runnable code and explicit limits.
- PROJECT / 003
Hohoo Embodied Experiments
Seven MuJoCo teaching experiments, from pickup bias to stage contracts, with raw trajectories, decisions and independent audits.
- LAB / 006
E2 / Confirm the grasp before transfer
Use sustained height and bilateral contact to decide whether transfer should proceed.